Contract (17) for the year 2013 to complete the designs, equip, implement, maintain and operate the Al-Numaniyah sewerage networks, Wasit Governorate
First: Study and design of rainwater and heavy water networks, lifting stations and pumping stations for the entire district of Al-Numaniyah in Wasit Governorate, in cooperation with the Italian company STECI Second: Equipping and establishing all civil works for the main and secondary lifting stations for rainwater and heavy water Third: Cooperation was made with specialized Western European companies Resina for the manufacture of mechanical and electrical equipment for the project Fourth: Equipping and installing all electrical works for lifting stations Main and sub-
Fifth: Preparing and extending all pipes for the project
From networks to transmission lines with different diameters ranging
Between
110 mm to 1400 mm and with U.P.V.C and G.R.P types and in cooperation
With various European and Arab companies
Sixth: Preparing and implementing all civil works for inspection basins and all types 7. Preparing the city with specialized machinery for the works field
Seventh: Maintenance and operation of the project for a year after the completion of the contract works
The aim of the project
The Numaniyah Sewerage Networks Project is located in the Numaniyah District, approximately 180 km south of the capital Baghdad. The project aims to complete 5 sewerage and rainwater networks, with the rehabilitation of 3 stations for previously implemented rainwater networks. The project serves the residents of the Numaniyah District, whose population is 40,000 people, for a period of 25 years, i.e. until 2050, when the population of the district will reach 100,000 people, i.e. a growth rate of 3% per year.